LOAD LIST - ALL ITEMS

Wearenowhere Ltd (Alby + Brylee Barbour)
Alby + Brylee WEDDING

Share

Jobs Hub Copy Link
Printed: 29/04/2025

Wearenowhere Ltd (Alby + Brylee Barbour)

Alby + Brylee WEDDING

Customer Details

Customer
Wearenowhere Ltd (Alby + Brylee Barbour)
Telephone
Job reference
165173
Project manager
Viarni

Delivery details

Venue Address
Ari Kingsland, 1A Bond Street
Grey Lynn
Auckland
1021
Hire period
Sun, 27 Apr 2025 to Tue, 29 Apr 2025
Set up dates
Sun, 27 Apr 2025 to Sun, 27 Apr 2025
Arrive from: 13:00
Takedown dates
Tue, 29 Apr 2025 to Tue, 29 Apr 2025
Arrive from: 09:30 to 10:00

Delivery instructions

Delivery - Sunday 27th April: 1pm Collection - Tuesday 29th April: 10am Contact -Alby:0278625400
April 04, 2025, TN
Make sure the 4 tables are nice ones!!!
April 23, 2025, VT
Concrete weights, one side will need to be internal. Hayden said that is sweet
April 26, 2025, VT
UPDATE - Delivery at 11am
April 26, 2025, TN

Boxes

Boxes / stillages required for this job
NameName
PickedPicked
PackedPacked
No boxes have been added yet
Item QTY Picked
Loaded
Packed
Other
Dining tables
Dining Table Legs
8
Dining Table Top - White
4
Dining seating
Ghost Victoria Chair
Ghost chair.jpg
32
Lounge seating
Mid Sofa - Natural
Mid+Sofa.jpg
2
Bobby Chair - Natural
Website+pics+-+landscape+(1).jpg
4
Occasional tables
Memphis Coffee Table - White
Untitled+design.jpg
2
Bar tables
Bar Leaner - White
WHITE+LEANER_clearcut.jpg
4
Bar seating
Bentwood Bar Stool - Oak
BENTWOOD+STOOL+HIRE_clearcut.jpg
16
Bars
Bend Bar - White 3m
2246C3B4-222D-4A77-AA47-64BCDABC7871.jpg
1
Additions
Square White Plinth - Large
Untitled+design+(3).jpg
3
Square White Plinth - Small
Untitled+design+(3).jpg
3
Delivery
Delivery & Collection - Furniture Zone 1
1
Administration
1
Delivery & Collection - Marquee Zone 1 (Includes staff, transport, erection and dismantle of marquee)
1
Weights
150kg Concrete Weights
10
Black & Clear Marquee - 9x3m
Liri components
Black Upright (NPT/260)
4
Black Gable pole (NPT9/260)
4
Black Roof beam (NPT9)
4
2952mm Intermediate purlin (NPT-3)
3
2952mm Black Eave purlin (NPT-3)
2
3018mm Black Gable beam “A1”(NPT)
2
3018mm Black Gable beam “A2”(NPT)
2
3M Black Gable beam“B”(NPT)
2
2952mm Black Side portal beam “B”(NPT-3)
4
Black Eave connection (NPT)
4
Black Top connection (NPT)
2
2940mm Tensioning rail (NPT-3)
8
x6*4200mm Black Roof bracing wire (NPT9- 12) SET
6
3080mm Black Sidewall downside bar (PT-3)
4
3120mm Black Gable Sidewall downside bar (NPT)
4
3M Steel fork (PT)
2
Black Base plate “A”(NPT)
4
Black Base plate “B1”(NPT)
2
Black Base plate “B2”(NPT)
2
9*3M Clear/Black PVC roof cover (NPT9-3)
1
9M Clear/Black Gable triangle cover (NPT9) PAIR
2
3*2.6M Plain Clear/Black PVC sidewalls (NPT/260-3) PAIR
8
Black Connector with crook end for tension bar
4
Black Straight connector for tension bar
4
1′′Black Ratchet assembly (NPT) SET
4
M10*110 Black Hexagon Bolt
10
M10*70 Black Hexagon Bolt
22
M10*130 Black Hexagon Bolt
18
M10 Black Butterfly nut
42
M10 Black Lifting Eye nut
8
10mm HEX Wrench
1
Overall Total weight: 0

Picking stage

Mark Picking As Complete

Please sign in to mark as complete

Damian has signed and agreed to these documents

Damian

Employee print name

27-04-2025

Date signed
Employee signature

Packing stage

Mark Packing As Complete

Please sign in to mark as complete

Damian has signed and agreed to these documents

Damian

Employee print name

27-04-2025

Date signed
Employee signature